View: Text-Only | Mobile

 

BIRC - Business Innovation Research Center

Publications by BIRC Faculty


 

Journal Articles (Refereed):

1984

1985

1988

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Published in Conference Proceedings (Refereed):

1984

1985

1990

1991

1992 1993 1994 1995
1996 1997 1998 1999 2000 2001 2002 2003
2004 2005 2006 2007





Journal Articles (Refereed):

(2010)

  1. Battini, D., Gunasekaran, A., Faccio, M., Persona, A. and Sgarbossa, F., "Consignment stock inventory model in an integrated supply chain", International Journal of Production Research, Vol. 48, No. 2, 2010, pp. 477-500.

  2. Setijono, D. and Gunasekaran, A., "Value modes effect and analysis (ValMEA): a PLS-based theory validation", International Journal of Productivity and Quality Management, Vol. 5, No. 2, 2010, pp. 213-230.

  3. Bayraktar, E., Gunasekaran, A., Koh, S.C.L., Tatoglu, E., Demirbag, M. and Zaim, S., "An efficiency comparison of supply chain management and information systems practices: A study of Turkish and Bulgarian small- and medium-sized enterprises in food products and beverages", International Journal of Production Research, Vol. 48, No. 2, 2010, pp. 425-451.

  4. Cheng, C.-H., Madan, M.S., Gunasekaran, A. and Yip, K.-Y., "An algorithm using Lagrangian relaxation and decomposition for solving a capacitated lot-sizing problem", International Journal of Mathematics in Operational Research, Vol. 2, No. 2, 2010, pp. 205-232.

(2009)

  1. Gunasekaran, A. and Ngai, E.W.T., "Modeling and Analysis of Build-to-Order Supply Chains" European Journal of Operational Research, Vol. 195, No. 2, 2009, pp. 319-334.

  2. Ngai, E.W.T. and Gunasekaran, A., "RFID adoption: Issues and Challenges", International Journal of Enterprise Information Systems, Vol. 5, No. 1, 2009, pp. 1-8.

  3. Gunasekaran, A., McGaughey, R.E., Ngai, E.W.T. and Rai, B.K., "E-Procurement adoption in the Southcoast SMEs", International Journal of Production Economics, Vol. 122, No. 1,2009, pp. 161-175.

  4. Law, K.M.Y., "The Dynamic organizational learning: a conceptual framework", Industrial and Commercial Training, Vol. 41, No. 6, 2009, pp. 314-320.

  5. Kamhawi, E.M. and Gunasekaran, A., "ERP Systems implementation success factors: IS and non-IS managers' perceptions", International Journal of Business Information Systems, Vol. 4, No. 6, 2009, pp. 688-704.

  6. Koh, S.C.L., Gunasekaran, A. and Cooper, J.R., "The Demand for training and consultancy investment in SME-specific ERP Systems implementation and operation", International Journal of Production Economics, Vol. 122, No. 1, 2009, pp. 241-254.

  7. Gunasekaran, A. and McGaughey, R.E., "Mobile Commerce: Issues and Obstacles", International journal of Business Information Systems, Vol. 4, No. 2, 2009, pp. 245-261.

  8. Jain, R., Gunasekaran, A., and Chandrasekaran, A., "Evolving role of business process reengineering: a perspective of employers", Industrial and Commercial Training, Vol. 41, 2009, No. 7, pp. 382-390.

(2008)

  1. Gunasekaran, A., Lai, K.-H. and Cheng, T.C.E., "Responsive Supply Chain: A Competitive Strategy in a Networked Economy", OMEGA, Vol. 36, No. 4 (2008), 549-564.

  2. Gunasekaran, A. and Ngai, E.W.T., "Adoption of e-procurement in Hong Kong: An Empirical Research", International Journal of Production Economics, Vol. 113, No. 1 (2008), pp. 159-175.

  3. Muralidharan, J., Gunasekaran, A., Nachiappan, S.P. and Nivin Kumar, A., "Efficient Mechanism development for multirobot coordination", International Journal of Industrial and Systems Engineering, Vol. 3, No. 2 (2008), pp. 149-161.

  4. Koh, S.C.L., Gunasekaran, A. and Rajkumar, D., "ERPII: The Involvement, Benefits and Impediments of Collaborative Information Sharing", International Journal of Production Economics, Vol. 113, No. 1 (2008), pp. 245-268.

  5. Ketikidis, P.H., Koh, S.C.L., Dimitriadis, N., Gunasekaran, A. and Kehajova, M., "The Use of Information Systems for Logistics and Supply Chain Management in South East Europe: Current Status and Future Direction", OMEGA, Vol. 36, No. 4 (2008), 592-599.

  6. Bayraktar, E., Koh, S.C.L., Gunasekaran, A. and Sari, K. and Tatoglu, E., "The Role of Forecasting on Bullwhip Effect for E-SCM Applications", International Journal of Production Economics, Vol. 113, No. 1 (2008), pp. 193-204.

    BACK TO TOP

    (2007)

  7. Gunasekaran, A. and Ngai, E.W.T., "Knowledge Management in 21st Century Manufacturing", International Journal of Production Research, Vol. 45, No. 11 (2007), 2391-2418.

  8. Ngai, E.W.T. and Gunasekaran, A., "A Review for Mobile Commerce Research and Applications", Decision Support Systems, Vol. 43, No. 43 (2007), 3-15.

  9. Gunasekaran, A. and Kobu, B., "Performance Measures and Metrics in Logistics and Supply Chain Management: A Review of Recent Literature (1995-2004) for Research and Applications", International Journal of Production Research, Vol. 45, No. 12 (2007), 2819-2840.

  10. Sarkis, J., Talluri, S. and Gunasekaran, A., "A Strategic Model for Agile Virtual Enterprise Partner Selection", International Journal of Operations & Production Management, Vol. 27, No. 11 (2007), 1213-1234.

  11. Koh, S.C.L., Gunasekaran, A. and Saad, S.M., "Tackling Uncertainty in ERP-Controlled Manufacturing Environment: A Knowledge Management Approach", The International Journal of Advanced Manufacturing Technology, Vol. 31, Nos. 7-8 (2007), pp. 833-840.

  12. Gunasekaran, A., Ngai, E.W.T. and Cheng, T.C.E., "Developing an E-Logistics System: A Case Study", International Journal of Logistics: Research and Applications, Vol. 10, No. 4 (2007), 333-349.

  13. McGaughey, R.E. and Gunasekaran, A., "Enterprise Resource Planning (ERP): Past, Present and Future", International Journal of Enterprise Information Systems", Vol. 3, No. 3 (2007), pp. 23-35.

  14. Marri, H.B., Gunasekaran, A. And Sohag, R.A., "Implementation of Advanced Manufacturing Technology in Pakistani Small and Medium Enterprises: An Empirical Analysis", Journal of Enterprise Information Management, Vol. 20, No. 6 (2007), 726-739.

  15. Marri, H.B., Irani, Z. And Gunasekaran, A., "Advance Manufacturing Technology Implementation in SMEs: A framework of Justification Criteria", International Journal of Electronic Business, Vol. 5, No. 2 (2007), 124-140.

  16. Yusuf, Y. and Gunasekaran, A., "Implementation of TQM in China and Organization Performance: An Empirical Investigation", Total Quality Management & Business Excellence, Vol. 18, No. 5 (2007), 509-530.

  17. Arul, S.V., Gunasekaran, A., Nachiappan, S.P. and Ramasamy, B., "Development of Efficient Combinatorial Auction Mechanism for Airport Slot Allocation", International Journal of Services and Operations Management, Vol. 3, No. 4 (2007), 427-443.

  18. Nachiappan, S.P., Gunasekaran, A. and Jawahar, N., "Knowledge Management System for Operating Parameters in Two-Echelon VMI Supply Chains", International Journal of Production Research, Vol. 45, No. 11 (2007), 2479-2505.

  19. Gunasekaran, A. and Ngai, E.W.T., "Managing Digital Enterprise", International Journal of Business Information Systems, Vol. 2, No. 3 (2007), 266-275.

  20. Wickramatillake, C.D., Koh, S.C.L., Gunasekaran, A. and Arunachalam, S., "Measuring performance within the supply chain of a large scale project", Supply Chain Management: An International Journal, Vol. 12, No. 1 (2007), 52-59.

  21. Arul, S.V., Gunasekaran, A., Nachiappan, S.P. and Naganathan, V., "A Design of Experiment based procedure for Real-Time Forecasting", International Journal of Industrial and Systems Engineering, Vol. 2, No. 1 (2007), 61-78.

    BACK TO TOP

    (2006)

  22. Gunasekaran, A., Ngai, E.W.T. and McGaughey, R.E., "Information technology and systems justification: A review for research and applications", European Journal of Operational Research, Vol. 173, No. 3 (2006), 957-983.

  23. Koh, S.C.L., Gunasekaran, A. and Saad, S.M., "Parts Verification for Multi-level Dependent Demand Manufacturing systems: A Recognition and Classification", International Journal of Advanced Manufacturing Technology, Vol. 31 (2006), 305-315.

  24. Yusuf, Y., Gunasekaran, A. and Wu, C., "Implementation of Enterprise Resource Planning in China", Technovation, Vol. 26, No. 12 (2006), 1324-1336.

  25. Gunasekaran, A. and Ngai, E.W.T., "Web-based Learning: An Empirical Analysis", International Journal of Information and Operations Management Education, Vol. 1, No. 4 (2006), 407-429.

  26. Razmi, J., Zairi, M and Gunasekaran, A., "The Application of Analytic Hierarchy Process in Classification of Material Planning and Control Systems", International Journal of Services and Operations Management, Vol. 2, No. 3 (2006), 352-366.

  27. So, H.W.T., Gunasekaran, A. and Chung, W.W.C., "Last Mile Fulfillment Strategy for Competitive Advantage", International Journal of Logistics Systems and Management, Vol. 2, No. 4 (2006), 404-418.

  28. Koh, S.C.L. and Gunasekaran, "Performance Prediction using Supply Chain Uncertainty Modeling", International Journal of Services and Operations Management, Vol. 2, No. 3 (2006), 279-293.

  29. Koh, S.C.L. and Gunasekaran, A., "A Knowledge Management Approach for Managing Uncertainty in Manufacturing", Industrial Management and Data Systems, Vol. 106, No. 4 (2006), 439-459.

  30. So, H.W.T., Gunasekaran, A. and Chung, W.W.C., "A Development of Business Agility Enterprise Model for Competitive Advantage: Theory and Practice", International Journal of Services & Operations Management, Vol. 2, No. 1 (2006), 42-59.

  31. Pan, X., Gunasekaran, A. and McGaughey, R.E., "Global e-Business: Firm size, Credibility and Desirable Modes of Payment", International Journal of Business Information Systems, Vol. 1, No. 4 (2006), 426-438.

  32. El-Rajabi, M.T.A. and Gunasekaran, A., "The Accuracy of Earnings Forecasts Disclosed in the Prospectuses of Newly Formed Public Companies in Jordon", Managerial Auditing Journal, Vol. 21, No. 2 (2006), 117-131.

  33. Chiu, R.K., Koh, S.C.L. and Gunasekaran, A., "An empirical analysis of business efficiency from the implementation of enterprise information system", International Journal of Business Information Systems, Vol. 1, No. 4 (2006), 387-407.

    BACK TO TOP

    (2005)

  34. Gunasekaran, A., James Williams, H. and McGaughey, R.E., "Performance Measurement and Costing Systems in New Enterprise", Technovation, Vol. 25, No. 5 (2005), 523-533.

  35. Gunasekaran, A. and Ngai, E.W.T., "Build-to-Order Supply Chain Management: A Literature Review and Framework for Development", Journal of Operations Management, Vol. 23, No. 5 ((2005), 423-451.

  36. Koh, S.C.L., Gunasekaran, A., Saad, S.M. and Arunachalam, S., "Uncertainty in ERP-controlled Manufacturing Systems", International Journal of Enterprise Information Systems, Vol. 1, No. 3 (2005), 17-34.

  37. Gupta, K. and Gunasekaran, A, "Costing in New Enterprise Environment: Challenge for Managerial Accounting Researchers and Practitioners", Managerial Auditing Journal, Vol. 20, No. 4 (2005), 337-353.

  38. Koh, S.C.L., Gunasekaran, A., Thomas, A. and Arunachalam, S., "The Application of Knowledge Management in Call Centers", Journal of Knowledge Management, Vol. 9, No. 4 (2005), 1367-3270.

  39. Gunasekaran, A. and Ngai, E.W.T., "E-Commerce in Hong Kong : An Empirical Perspective and Analysis", Internet Research, Vol. 15, No. 2 (2005), 141-159.

  40. Koh, S.C.L., Gunasekaran, A. and Saad, S.M., "An Empirical Study of the Effects of Uncertainty on SME Manufacturers", International Journal of Services and Operations Management, Vol. 1, No. 4 (2005), 395-426.

  41. Koh, S.C.L., Gunasekaran, A. and Saad, S.M., "A Business Model for Uncertainty Management", Benchmarking: An International Journal, Vol. 12, No. 4 (2005), 383-400.

  42. Lam, SS., Nagi, E.W.T. and Gunasekaran, A., "A framework for an e-business curriculum", International Journal of Information and Operations Management Education, Vol. 1, No. 1 (2005), 32-43.

    BACK TO TOP

    (2004)

  43. Gunasekaran, A. and Ngai, E.W.T., "Virtual Supply Chain Management", International Journal of Production Planning and Control, Vol. 15, No. 6 (2004), 584-595.

  44. Sandhu, M. and Gunasekaran, A., "Business Process Development in Project-Based Industries: A Case Study", Business Process Management Journal, Vol. 10, No. 6 (2004), 673-690.

  45. Gunasekaran, A. and Ngai, E.W.T., "3PL: Experiences from China resources logistics ( Hong Kong )", International Journal of Logistics Systems and Management, Vol. 1, No.1 (2004), 81-97.

  46. Yusuf, Y.Y., Gunasekaran, A., Adeleye, E.O. and Sivayoganathan, K., "Agile Supply Chain Capabilities: Determinants of Competitive Objectives", European Journal of Operational Research, Vol. 159, No. 2 (2004), 379-392.

  47. El-Rajabi, M.T.A. and Gunasekaran, A., "Audit Professional Examination in Emerging Economy Jordan", Managerial Auditing Journal, Vol. 19, No. 8 (2004), 1033-1047.

  48. Gunasekaran, A. and Ngai, E.W.T., "Information Systems in Supply Chain Integration and Management", European Journal of Operational Research, Vol. 159, No. 2 (2004), 269-295.

  49. Ngai, E.W.T. and Gunasekaran, A., "Implementation of EDI in Hong Kong: An Empirical Analysis", Industrial and Data Management Systems, Vol. 104, No. 1 (2004), 88-100.

  50. Gunasekaran, A., Patel, C. and McGaughey, R., "A Framework for Supply Chain Performance Measurement", International Journal of Production Economics, Vol. 87, No. 3 (2004), 333-348.

  51. Gunasekaran, A., McGaughey, R.E. and McNeil, R.D., "E-commerce: Teaching and Learning", Journal of Electronic Commerce in Organizations, Vol. 2, No. 2 (2004), 1-16.

  52. Yahaya, Y.Y., Gunasekaran, A. and Abthorpe, M., "Enterprise Information Systems Project Implementation: A Case Study of ERP in Rolls-Royce", International Journal of Production Economics, Vol. 87, No. 3 (2004), 251-266.

  53. Gunasekaran, A. and Ngai, E.T.W., "Attitude towards E-Commerce and Education: An Empirical Analysis", Journal of Electronic Commerce in Organizations, Vol. 2, No. 2 (2004), 95-112.

    BACK TO TOP

    (2003)

  54. Mandal, P. and Gunasekaran, A., "Issues in Implementing ERP: A Case Study", European Journal of Operational Research, Vol. 146 (2003), 274-283.

  55. Gunasekaran, A. and Ngai, E.W.T., "The Successful Management of a Small Logistics Company", International Journal of Physical Distribution & Logistics Management, Vol. 33, No. 9 (2003), 825-842.

  56. McLaughlin, J., Motwani, J., Madan, M. and Gunasekaran, A., "Using Information Technology to Improve Downstream Supply Chain Operations: A Case Study", Business Process Management Journal, Vol. 9, No. 1 (2003), 69-80.

  57. Sivasubramanian, R., Selladurai, V. and Gunasekaran, A., "Utilization of Bottleneck Resources for Profitability through a Synchronized Operation of Marketing and Manufacturing", Integrated Manufacturing Systems, Vol. 14, No. 3 (2003), 238-246.

  58. Marri, H.B., Gunasekaran, A. and Kobu, B., "Implementation of Computer-Integrated Manufacturing in Small and Medium Enterprises", Industrial and Commercial Training, Vol. 35, No. 4 (2003), 151-157.

  59. R. Sivasubramanian, R., Selladurai, V. and Gunasekaran, A., "Optimum Production Schedule and Profit Maximization using the Concept of Theory of Constraints", International Journal of Manufacturing Technology Management, Vol. 5, No. 4 (2003), 325-337.

    BACK TO TOP

    (2002)

  60. Gunasekaran, A. and Kobu, B., "Modelling and Analysis of Business Process Reengineering", International Journal of Production Research, Vol. 40, No. 11 (2002), 2521-2546.

  61. Gunasekaran, A. and Yusuf, Y., "Agile Manufacturing: A Taxonomy of Strategic and Technological Imperatives", International Journal of Production Research, Vol. 40, No. 6 (2002), 1357-1385.

  62. Mandal, P., Love, P.E.D. and Gunasekaran, A., "Towards a System Dynamics Modelling Framework for Quality in Manufacturing", International Journal of Manufacturing Technology Management, Vol. 4, No. 3/4 (2002), 333-342.

  63. Gunasekaran, A., Marri, H.B., McGaughey, R. and Nebhwani, M.D., "E-Commerce and its Impact on Operations Management", International Journal of Production Economics, Vol. 75, Nos. 1-2 (2002), 185-197.

  64. Gunasekaran, A., McNeil, R.D. and Shaul, D., "E-Learning: Research and Applications", Industrial and Commercial Training, Vol. 34, No. 2 (2002), 44-53.

  65. Lyu, J.J., Ding, J.-H. Ding, Lee, M.-C. Lee and Gunasekaran, A., "Implementation of Executive Information Systems in the Client/Server Environment: An Approach Developed from the Case Study", International Journal of Information Technology Management, Vol 1, Nos. 2/3 (2002), 191-201.

  66. Gunasekaran, A., Tirtiroglu, E. and Wolstencroft, V., "An Investigation into the Application of Agile Manufacturing in an Aerospace Company", Technovation, Vol. 22 (2002), 405-415.

  67. Mandal, P. and Gunasekaran, A., "An Analysis of Quality Initiatives in the Australian and Indian Manufacturing Industries", International Journal of Manufacturing Technology Management, Vol. 4, No. 3/4 (2002), 210-220.

  68. Ramaswamy, N., Selladurai, V. and Gunasekaran, A., "Just-In-Time Implementation in Small and Medium Enterprises", Work Study , Vol. 51, No. 2 (2002), 85-90.

  69. Hussain, M.M. and Gunasekaran, A., "Non-Financial Management Accounting Measures in Finish Financial Institutions", European Business Review, Vol. 14 (2002), No. 3, 210-229.

  70. Hussain, M., Islam, M.M., Gunasekaran, A. and Maskooki, M., "Accounting standards and practices of financial institutions in GCC countries, Managerial Auditing Journal, Vol. 17, No. 7 (2002), 350-362.

  71. Mandal, P., Love, P.E.D. and Gunasekaran, A., "A Conceptual Approach to Modeling Strategic Issues to Improve the Performance and Competitiveness of Manufacturing", International Journal of Manufacturing Technology Management, Vol. 4, Nos. 3/4 (2002), 303-321.

  72. Hussain, M.M. and Gunasekaran, A., "Management Accounting and Performance Measures in Japanese Banks", Managing Service Quality, Vol. 12, No. 4 (2002), 232-245.

  73. Arunachalam, S. McAndrew, I. , O'Sullivan, J.M. and Gunasekaran, A., "Implications of QS-9000 in the Implementation of a New Technology: A Case Study", International Journal of Manufacturing Technology Management, Vol. 4, Nos. 3/4 (2002), 322-332.

  74. Gunasekaran, A., Tirtiroglu, E. and Wolstencroft, V., "Gap Between Production and Marketing Functions: A Case Study", Management Decision, Vol. 40, No. 5 (2002), 428-435.

  75. March, I., Gunasekaran, A. and Lloria, B.A., "Product Development Process in Spanish SMEs: An Empirical Research", Technovation, Vol. 22 (2002), 301-312.

  76. Hussain, M.M. and Gunasekaran, A., "An Institutional Perspective of Non-Financial Management Accounting Measures: A review of the Financial Services Industry", Managerial Auditing Journal, Vol. 17, No. 9 (2002), 518-536 ( Outstanding Paper Award ).

  77. Gunasekaran, A. and Marri, H.B., "Application of Aggregate Production Planning Models in Developing Countries", International Journal of Management and Decision Making, Vol. 3, No. 3/4 (2002), 229-242.

  78. Mandal, P. and Gunasekaran, A., "Application of SAP R/3 in On-line Inventory Control", International Journal of Production Economics, Vol. 75, Nos. 1-2 (2002), 47-55.

  79. Marri, H.B., Gunasekaran, A. and Kobu, B., "Government-Industry-University Collaboration on the Successful Implementation of CIM in SMEs: An Empirical Analysis", Logistics Information Management, Vol. 15, No. 2 (2002), 105-114.

  80. Hussain, M., Islam, M.M., Gunasekaran, A. and Maskooki, K., "A Comparative Study of Accounting Standards of Financial Institutions in GCC Countries", International Journal of Management and Decision Making, Vol. 3, No.3/4 (2002), 243-255.

  81. Motwani, J., Mirchandani, D., Madan, M. and Gunasekaran, A., "Successful Implementation of ERP Projects: Evidence from Two Case Studies", International Journal of Production Economics, Vol. 75, Nos. 1-2 (2002), 83-96.

  82. Irani, Z., Choudrie, J., Love, P.E.D. and Gunasekaran, A., "Sustaining TQM Through Self-Directed Work Teams", International Journal of Quality & Reliability Management, Vol. 19, No. 5 (2002), 596-609.

    BACK TO TOP

    (2001)

  83. Gunasekaran, A., Marri, H.B., McGaughey, R. and Grieve, R.J., "Implications of Organization and Human Behaviour on the Implementation of CIM in SMEs: An Empirical Investigation", International Journal of Computer-Integrated Manufacturing, Vol. 14, No. 2 (2001), 175-185.

  84. Gunasekaran, A., Opanasenko, J. and Yli-Olli, P., "Managing Operations in Small and Medium-Sized Enterprises in Russia: An Empirical Research", International Journal of Manufacturing Technology Management, Vol. 3, Nos. 4/5 (2001), 375-392.

  85. Mousavi, A., Adl, P., Rakowski, R.T., Gunasekaran, A. and Mirnezami, N., "Design of Production Planning System Using Customer Oriented Design and Resource Utilization (CODARU)", International Journal of Advanced Manufacturing Technology, Vol. 17 (2001), 805-809.

  86. Gunasekaran, A., Love, P.E.D., Rahimi, F. and Miele, R., "A Model for Investment Justification in Information Technology Projects", International Journal of Information Management, Vol. 21 (2001), 349-364.

  87. Mousavi, A., Adl, P., Rakowski, R.T., Gunasekaran, A. and Mirnezami, N., "Customer Optimization Route and Evaluation (CORE) for Product Design", International Journal of Computer-Integrated Manufacturing, Vol. 14, No. 2 (2001), 236-243.

  88. Gunasekaran, A., Patel, C. and Tirtiroglu, E., "Performance Measures and Metrics in a Supply Chain Environment", International Journal of Operations & Production Management, Vol. 21, No. 1/2 (2001), 71-87.

  89. Gunasekaran, A., McNeil, R., McGaughey, R. and Ajasa, T., "Experiences of a Small to Medium Size Enterprise in the Design and Implementation of Manufacturing Cells", International Journal of Computer-Integrated Manufacturing, Vol. 14, No. 2 (2001), 212-223.

  90. Hussain, M., Maskooki, K. and Gunasekaran, A., "The Implication of Grameen Banking System in Europe: Prospects and Prosperity", European Business Review, Vol. 13, No. 1 (2001), 26-41.

  91. Hussain, M.M. and Gunasekaran, A., "Activity-based Cost Management in Financial Services Industry", Managing Service Quality, Vol. 11, No. 3 (2001), 213-223.

    BACK TO TOP

    (2000)

  92. Marri, H.B., Gunasekaran, A. and Grieve, R.J., 2000, "Performance Measurements in the Implementation of CIM in SMEs: An Empirical Analysis", International Journal of Production Research, Vol. 38, No. 17 (2000), 4403-4411.

  93. Gunasekaran, A., "World Class Manufacturing Techniques in Small and Medium Enterprises", International Journal of Manufacturing Technology Management, Vol. 2, Nos. 1-7 (2000), 777-789.

  94. Gunasekaran, A. and Adebayo, J., "GEC Alsthom Learns Many Lessons from BPR", Production and Inventory Management Journal, Vol. 41, No. 2 (2000), 9-13.

  95. Koh, S.C. , Jones, M.H., Saad, S.M., Arunachalam, S. and Gunasekaran, A., "Measuring uncertainties in MRP environments", Logistics Information Management, Vol. 13, No. 3 (2000), 177-183.

  96. Thoburn, J.G., Arunachalam, S. and Gunasekaran, A., "Tracing of Information links empirically (TILE) in small and medium sized enterprises (SMEs)", Logistics Information Management, Vol. 13, No. 4 (2000), 248-255.

  97. Gunasekaran, A., McNeil, R. and Singh, D., "Activity-Based Management in a Small Company", International Journal of Production Planning & Control, Vol. 11, No. 4 (2000), 391-399.

  98. Gunasekaran, A., Marri, H.B. and Lee, B., "Design and Implementation of Computer-Integrated Manufacturing in Small and Medium Enterprises: A Case Study", International Journal of Advanced Manufacturing Technology, Vol. 16 (2000), 46-54.

  99. Gunasekaran, A., Forker, L. and Kobu, B., "Improving Operations Performance in a Small Company: A Case Study", International Journal of Operations and Production Management, Vol. 20, Nos. 3 and 4 (2000), 316-335.

  100. Motwani, J., Madan, M. and Gunasekaran, A., "Information technology in managing global supply chains", Logistics Information Management, Vol. 13, No. 5 (2000), 320-327.

  101. Gunasekaran, A., Macbeth, D.K. and Lamming, R., "Modelling and analysis of supply chain management systems: an editorial overview", Journal of Operational Research Society, Vol. 51, (2000), 1112-115.

  102. Gunasekaran, A., Chung, W.W.C. and Kan, K., 2000, "Business process reengineering in a British company: a case study", Logistics Information Management, Vol. 13, No. 5 (2000), 271-285.

    BACK TO TOP

    (1999)

  103. Susila, B., Gunasekaran, A., Arunachalam, S. and Radhakrishnan, P., "Interfacing Geometric Model Data with Rapid Prototyping Systems", Journal of Intelligent Manufacturing, Vol. 10 (1999), 323-329.

  104. Li, H., Love, P.E.D. and Gunasekaran, A., "A Conceptual Approach to Modelling the Procurement Process of Construction using Petri-Nets", Journal of Intelligent Manufacturing, Vol. 10 (1999), 347-353.

  105. Gunasekaran, A., Marri, H.B. and Grieve, R.J., "Justification and Implementation of Activity Based Costing in Small and Medium Enterprises", Logistics Information Management, Vol. 12, No. 5 (1999), 386-394.

  106. Gunasekaran, A., Marri, H.B. and Menci, F., "Improving the Effectiveness of Warehousing Operations: A case Study", Industrial Management & Data Systems, Vol. 99, No. 8 (1999), 328-339.

  107. McGaughey, R.E. and Gunasekaran, A., "The Y2K Problem: Manufacturing Inputs at Risk", International Journal of Production Planning and Control, Vol. 10, No. 8 (1999), 796-808.

  108. Gunasekaran, A. and Goyal, S.K., "Multi-Stage Production System: Modelling and Analysis using Simulation", International Journal of Computer Applications in Technology, Vol. 12, No. 2-5 (1999), 119-130.

  109. Lyu, J. and Gunasekaran, A., "An Object-Oriented Approach to Model a Just-In-Time Production System", International Journal of Computer Applications in Technology, Vol. 12, No. 2-5 (1999), 199-205.

  110. Gunasekaran, A., Marri, H.B and Yusuf, Y.Y., "Application of Activity-Based Costing: Some Case Experiences", Managerial Auditing Journal, Vol. 14, No. 6-7 (1999), 286-293.

  111. Gunasekaran, A. and Singh, D., "Design of an Activity-Based Costing System in SMEs: A Case Study", Computers & Industrial Engineering: An International Journal, Vol. 37 (1999), 413-416.

  112. Gunasekaran, A., Marri, H.B. and Grieve, R.J., "Activity-Based Costing in Small and Medium Enterprises", Computers & Industrial Engineering: An International Journal, Vol. 37 (1999), 407-411.

  113. Arunachalam, S., Gunasekaran, A., Ngum, S.M., Gill, K.F. and O' Sullivan, J.M., "Taguchi Controlled Knowledge-based Assistant for Improving Quality of Hollow Cylindrical Sections", International Journal of Advanced Manufacturing Technology, Vol. 15 (1999), 503-508.

  114. Thoburn, J.G., Arunachalam, S. and Gunasekaran, A., "Difficulties Arising from Dyfunctional Information Systems in Manufacturing SMEs - Case Studies", International Journal of Agile Management Systems, Vol. 1, No. 2 (1999), 116-126.

  115. Gunasekaran, A., "A Framework for the Design and Audit of an Activity-Based Costing System", Managerial Auditing Journal, Vol. 14, No. 3 (1999), 118-126.

  116. Yamin, S. and Gunasekaran, A., "Organizational Quality: A Cognitive Approach to Quality Management", TQM Magazine, Vol. 11, No. 3 (1999), 180-187.

  117. Yamin, S., Gunasekaran, A. and Mandavo, F., "Relationship between Generic Strategies, Competitive Advantage and Organizational Performance: An Empirical Analysis", TECHNOVATION, Vol. 19 (1999), 507-518.

  118. Gunasekaran, A., "Agile Manufacturing: A Framework for Research and Development", International Journal of Production Economics, Vol. 62 (1999), 87-105.

  119. Yusuf, Y.Y., Sarhadi, M. and Gunasekaran, A., "Agile Manufacturing: the Drivers, Concepts and Attributes", International Journal of Production Economics, Vol. 62 (1999), 33-43.

  120. March, I. and Gunasekaran, A., "Business Strategy in New High-Tech Ventures: An Empirical Analysis", Management Decision, Vol. 37, No. 3 and 4 (1999), 222-232.

  121. Gunasekaran, A. and Love, P.E.D., "Current and Future Directions of Multimedia Technology in Business", International Journal of Information Management, Vol. 19 (1999), 105-120.

  122. Subrahmanyam, G., Gunasekaran, A., Arunachalam, S. and Radhakrishnan, P., "Development of a Tool Database Management System: A Case Study", International Journal of Advanced Manufacturing Technology, Vol. 15 (1999), 562-565.

  123. Gunasekaran, A., "Enablers of Total Quality Management in manufacturing: A Case Study", Total Quality Management, Vol. 10, No. 7 (1999), 987-996.

  124. Arunachalam, S., Gunasekaran, A. and O'Sullivan, J.M., "Analyzing the Process Behaviour of Reaming Process using an Experimental Approach", International Journal of Machine Tools & Manufacture: Design, Research and Application, Vol. 39 (1999), 1311-1325.

  125. Love, P.E.D. and Gunasekaran, A., "Learning Alliances: A Customer-Supplier Focus for Continuous Improvement in Manufacturing ", Industrial and Commercial Training, Vol. 31, No. 3 (1999), 88-96.

  126. Gunasekaran, A. and Thevarajah, K., "Implications of Computer-Integrated Manufacturing in Small and Medium Enterprises: An Empirical Investigation", International Journal of Advanced Manufacturing Technology, Vol. 15 (1999), 251-260.

  127. Yamin, S., Gunasekaran, A. and Mavondo, F., "Innovation Index and its Implications on Organizational Performance: A Study of Australian Manufacturing Companies", International Journal of Technology Management, Vol. 17, No. 5 (1999), 495-503.

  128. Gunasekaran, A., "Just-in-Time Purchasing: An Investigation for Research and Applications", International Journal of Production Economics, Vol. 59 (1999), 77-84.

  129. Gunasekaran, A. and Love, P., "A Review of Multimedia Technology in Manufacturing", Computers in Industry: An International Journal, Vol. 38 (1999), 65-76.

    BACK TO TOP

    (1998)

  130. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "A Conceptual Framework for the Implementation of Zero Inventory and Just-In-Time Manufacturing Concepts", International Journal of Human Factors in Manufacturing, Vol. 8, No. 1 (1998), 63-78.

  131. Gunasekaran, A., "An Analysis and Experiences on the Management of International and Joint R&D Projects", Management Decision, Vol. 36, No. 9 and 10 (1998), 669-678.

  132. Gunasekaran, A. and Love, P.E.D., "Concurrent Engineering: A Multidisciplinary Approach for Construction", Logistics Information Management, Vol. 11, No. 4 and 5 (1998), 295-300.

  133. Love, P.E.D., Gunasekaran, A. and Li, H., "Improving the Competitiveness of Manufacturing Companies by Continuous Incremental Change", TQM Magazine, Vol. 10, No. 3 (1998), 177-185.

  134. Hussain, M., Gunasekaran, A. and Laitinen, E., "Management Accounting System in Finnish Service Firms", TECHNOVATION - The International Journal of Technology Management, Vol. 18, No. 1 (1998), 57-67.

  135. Gunasekaran, A., "Agile Manufacturing: Enablers and an Implementation Framework" International Journal of Production Research, Vol. 36, No. 5 (1998), 1223-1247.

  136. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Production Capacity Planning and Control in Multi-Stage Manufacturing", Journal of Operational Research Society, Vol. 49 (1998), 625-634.

  137. Gunasekaran, A. and Cecille, P., "Implementation of Productivity Improvement Strategies in a Small Company", TECHNOVATION - The International Journal of Technology Management, Vol. 18, No. 5 (1998), 311-320.

  138. Marri, H.B., Gunasekaran, A. and Grieve, R.J., "An Investigation into the Implementation of Computer-Integrated Manufacturing in Small and Medium Enterprises", International Journal of Advanced Manufacturing Technology, Vol. 14 (1998), 935-942.

  139. Gunasekaran, A., "Concurrent Engineering: A Competitive Strategy for Process Industries", Journal of Operational Research Society, Vol. 49 (1998), 758-765.

  140. Love, P.E.D., Gunasekaran, A. and H. Li, "Putting an Engine into Re-engineering: Towards a Process Oriented Organization", International Journal of Operations & Production Management, Vol. 18, No. 9/10 (1998), 937-949.

  141. Marri, H.B., Gunasekaran, A. and Grieve, R.J., "Computer-Aided Process Planning - A State of Art ", International Journal of Advanced Manufacturing Technology, Vol. 14 (1998), 261-268.

  142. Perkins, D. and Gunasekaran, A., "Improving the Effectiveness of a Purchasing System in a Small Company: A Case Study", International Journal of Production Planning & Control, Vol. 9, No. 6 (1998), 611-618.

  143. Love, P.E.D., Gunasekaran, A. and Li, H., "Concurrent Engineering: A Strategy for Procuring Construction Projects", International Journal of Project Management, Vol. 16, No. 6 (1998), 375-383.

  144. Gunasekaran, A. and Cecille, P., "Experiences of a Small Company in Productivity Improvements", Production and Inventory Management Journal, Vol. 39, No. 2 (1998), 49-54.

  145. Gunasekaran, A., "An Integrated Product Development-Quality Management System for Manufacturing", TQM Magazine, Vol. 10, No., 2 (1998), 115-123.

  146. Rao, S., Gunasekaran, A., Goyal, S.K. and Martikainen, T., "Waiting Line Models in Manufacturing", International Journal of Production Economics, Vol. 54 (1998), 1-28.

  147. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Total Quality Management: A New Perspective for Improving Quality and Productivity", International Journal of Quality & Reliability Management, Vol. 15, No. 8/9 (1998), 947-968.

  148. Gunasekaran, A. and Sarhadi, M., "Implementation of Activity-Based Costing in Manufacturing", International Journal of Production Economics, Vol. 56-57 (1998), 231-242.

    BACK TO TOP

    (1997)

  149. Gunasekaran, A., "Essentials of International and Joint R&D projects", TECHNOVATION - The International Journal of Technology Management, Vol. 17, No. 11/12 (1997), 637-647.

  150. Gunasekaran, A. and Lyu, J., "Implementation of JIT in a Small Company: A Case Study", International Journal of Production Planning and Control, Vol. 8, No. 4 (1997), 406-412.

  151. Jegathesan, J., Gunasekaran, A. and Muthaly, S., "Technology Development and Transfer: Experiences from Malaysia ", International Journal of Technology Management, Vol. 13, No. 2 (1997), 196-214.

  152. Gunasekaran, A. and Nath, B.N., "The Role of Information Technology in Business Process Reengineering", International Journal of Production Economics, Vol. 50, No. 2, 3 (1997), 91-104.

  153. Lyu, J.J. and Gunasekaran, A., "An Intelligent Simulation Model to Evaluate Scheduling Strategies of a Steel Company", International Journal of Systems Science, Vol. 28, No. 6 (1997), 611-616.

  154. Love, P.E.D. and A. Gunasekaran, A., "Process Reengineering: A Review of Enablers", International Journal of Production Economics, Vol. 50, No. 2, 3 (1997), 183-197.

  155. Love, P.E.D. and A. Gunasekaran, A., "Concurrent Engineering in the Construction Industry", Concurrent Engineering: Research and Applications (CERA) - An International Journal, Vol. 5, No. 2 (1997), 155-162.

  156. Gunasekaran, A., "Implementation of Computer-Integrated Manufacturing: A Survey of Integration and Adaptability Issues", International Journal of Computer-Integrated Manufacturing, Vol. 10, No. 1-4 (1997), 266-280.

  157. Yamin, S., Mavondo, F., Gunasekaran, A. and J.C. Sarros, "A Study of Competitive Strategy, Organizational Innovation and Organizational Performance among Australian Manufacturing Companies", International Journal of Production Economics, Vol. 52, (1997), 161-172.

    BACK TO TOP

    (1996)

  158. Gunasekaran, A., Martikainen, T., Virtanen, I. and Yli-Olli, P., "A Conceptual Framework for Managing Congestion in Manufacturing", International Journal of Production Economics, Vol. 45, Nos. 1-3 (1996), 111-120.

  159. Setala, J. and Gunasekaran, A., "Activity-Based Costing and Management: A Way to Improve the Profitability of Fish Processing Industry", Production & Inventory Management Journal, Vol. 37, No. 4 (1996), 63-69.

  160. Muthaly, S. and Gunasekaran, A., "The Essential of a Successful Export Strategy for Vietnamese Small and Medium Enterprises", Enterprise Innovation and Change, Vol. 5, No. 4 (1996), 295-306.

  161. Gunasekaran, A., Okko, P., Martikainen, T. and Yli-Olli, P., "Improving Productivity and quality improvement in small and medium enterprises: Cases and Analysis", International Small Business Journal, Vol. 15, No. 1, Issue No. 5 (1996), 59-72.

  162. Lyu, J.J., Gunasekaran, A. and Ding, J.H., "Simulated Annealing Algorithms for Solving the Single Machine Early/Tardy Problem", International Journal of Systems Science, Vol. 27, No. 7 (1996), 605-610.

  163. Okko, P. and Gunasekaran, A., "An Analysis of Technology Transfer and Diffusion as a Part of Growth Strategy", International Journal of Technology Management, Vol. 12, No. 4 (1996), 477-487.

  164. Gunasekaran, A., Bignall, B. and Rahman, S.M., "Multimedia in Manufacturing", International Journal of Production Planning and Control, Vol. 7, No. 5 (1996), 440-451.

  165. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "On the Impact of Infrequent Trading on the Systematic Risk Components of the APT", European Journal of Operational Research, Vol. 88 (1996), 23-37.

  166. Lyu, J., Gunasekaran, A. and J.-H. Ding, "Statistical Analysis of the Impact of Air Pollution on the Quality of Inventory", International Journal of Quality & Reliability Management, Vol. 13, No. 7 (1996), 48-56.

  167. McTavish, R., Gunasekaran, A., Goyal. S.K. and Yli-Olli, P., "Establishing a Strategic Approach for Productivity Improvement", Integrated Manufacturing Systems: The International Journal of Manufacturing Technology Management , Vol. 7, No. 4 (1996), 12-21.

    BACK TO TOP

    (1995)

  168. Gunasekaran, A. Goyal, S.K., Virtanen, I. and Yli-Olli, P., "A Model for Integrated Production-packaging Systems", International Journal of Production Planning and Control, Vol. 6, No. 6 (1995), 508-515.

  169. Goyal, S.K. and Gunasekaran, A., "An Integrated Production-Inventory-Marketing Model for Deteriorating Items", Computers & Industrial Engineering: An International Journal, Vol. 28, No. 4 (1995), 755-762.

  170. Gunasekaran, A., Korukonda, A. R., Virtanen, I. and Yli-Olli, P., "Optimal Investment and Lot-sizing Policies for Improved Productivity and Quality", International Journal of Production Research, Vol. 33, No. 1 (1995), 261-278.

  171. Martikainen, T., Puhalainen, K., Yli-Olli, P. and Gunasekaran, A., "On the Time-series Stability of industry-relative Financial Ratio Patterns", International Journal of Systems Science, Vol. 26, No. 9 (1995), 1701-1713.

  172. Gunasekaran, A., Lyu, J., Virtanen, I. and Yli-Olli, P., "The Impact of OPT and TPM on the Economic Production Quantity", International Journal of Systems Science, Vol. 26, No. 9 (1995), 1715-1727.

  173. Lyu, J., Gunasekaran, A. and Kachitvichyanukul, V., "Towards a Portable and Efficient Environment for Parallel Computing", International Journal of Systems Science, Vol. 26, No. 6 (1995), 1333-1341.

  174. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "Financial Ratio Distributions Irregularities: Implications for Ratio Classifications", European Journal of Operational Research, Vol. 80, No. 1 (1995), 34-44.

  175. Selladurai, V., Aravindan, P., Ponnambalam, S.G. and Gunasekaran, A., "Dynamic Simulation of Job-shop Manufacturing System for Optimal Performance", International Journal of Operations & Production Management, Vol. 15, No. 7 (1995), 106-120.

  176. Lyu, J., Gunasekaran, A., Chen, C.Y. and Kao, C., "A Goal Programming Model for the Coal Blending Problem", Computers & Industrial Engineering: An International Journal, Vol. 28, No. 4 (1995), 861-868.

    BACK TO TOP

    (1994)

  177. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "Modelling the Lead-lag Effect between Dual-class Shares: Evidence from Finland ", International Journal of Systems Science, Vol. 25, No. 7 (1994), 1205-1211.

  178. Martikainen, T., Perttunen, J. and Gunasekaran, A., "A Note on Factor Identification and Return Interval: Evidence from Swedish Markets", International Journal of Finance, Vol. 6, No. 3 (1994), 887-892.

  179. Goyal, S.K. and Gunasekaran, A., "Determination of Economic Production Quantity in a Multi-Stage Production System", International Journal of Production Planning and Control, Vol. 5, No. 5 (1994), 499-503.

  180. Gunasekaran, A., Korukonda, A. R., Virtanen, I. and Yli-Olli, P., "Improving Productivity and Quality in Manufacturing Organizations", International Journal of Production Economics, Vol. 36, No. 2 (1994), 169-183.

  181. Lyu, J., and Gunasekaran, A., "Statistical Analysis of a Portable Parallel Non-linear Programming Algorithm", Statistics and Computing, Vol. 4 (1994), 253-258.

  182. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "The Impact of Return Interval on Common Factors in Stock Returns: Evidence from a Thin Security Market", Journal of Banking and Finance, Vol. 18, No. 4 (1994), 659-672.

  183. Martikainen, T. and Gunasekaran, A., "Variation of E/P Ratios: Implications for the E/P Anomaly ", International Journal of Systems Science, Vol. 25, No. 11 (1994), 1899-1909.

  184. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "An Investigation into the Application of Group Technology in Advanced Manufacturing Systems", International Journal of Computer Integrated Manufacturing, Vol. 7 (1994), 215-228.

  185. Gunasekaran, A., Virtanen, I. , Martikainen, T. and Yli-Olli, P., "The Design of Computer-Integrated Manufacturing Systems", International Journal of Production Economics, Vol. 34 (1994), 313-327.

  186. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Economic Scheduling of a New Order in a Job-Shop Production System", International Journal of Systems Science, Vol. 25, No. 2 (1994), 365-376.

  187. Goyal, S.K. and Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Discontinuous Optimization in a Multi-stage Batch Production System", International Journal of Systems Science, Vol. 25, No. 4 (1994), 789-802.

  188. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "On the common factors in restricted and unrestricted shares: Evidence from a partly segmented stock market", Scandinavian Journal of Economics, Vol. 96, No. 1 (1994), 117-123.

    BACK TO TOP

    (1993)

  189. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Determining Economic Batch Quantities in a Multi-level Manufacturing System", International Journal of Operations & Production Management, Vol. 13, No. 12 (1993), 79-93.

  190. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli Olli, P., "Modelling and Analysis of Just-In-Time Manufacturing Systems", International Journal of Production Economics, Vol. 32 (1993), 23-37.

  191. Lyu, J. and Gunasekaran, A., "Design for Quality of a Shipbuilding Industry", International Journal of Quality and Reliability Management, Vol. 10, No. 4 (1993), 57-63.

  192. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Determining Economic Inventory Policies in a Multi-Stage Just-In-Time Production System", International Journal of Production Economics, Vol. 30-31 (1993), 531-542.

  193. Lyu, J., Gunasekaran, A. and Ding, C.-H., "Design for Economic Feasibility of an Automation System: Case of a Shipbuilding Company", Computers in Industry: An International Journal, Vol. 22 (1993), 47-52.

  194. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Integrating Production and Quality Control Policies: A Survey", European Journal of Operational Research, Vol. 69 (1993), 1-13.

  195. Lyu, J., and Gunasekaran, A., "Implementation of Advanced Manufacturing Technology through Industry-Government-University Co-operation in Taiwan ", Computers in Industry: An International Journal, Vol. 22 (1993), 187-191.

  196. Martikainen, T., Yli-Olli, P. and Gunasekaran, A., "Modelling the Time-Series Variation of Earnings Response Coefficients in the Finnish Stock Market", International Journal of Systems Science, Vol. 24, No. 5 (1993), 829-840.

  197. Lyu, J. and Gunasekaran, A., "Developing a Visual Interactive Simulation Model for Flexible Manufacturing Systems", International Journal of Operations & Production Management, Vol. 13, No. 6 (1993), 59-67.

  198. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Design of Optimal Configuration for a Multi-Stage Production System", International Journal of Production Planning and Control, Vol. 4, No. 3 (1993), 239-252.

  199. Gunasekaran, A., Martikainen, T. and Yli Olli, P., "Modelling the Effect of Demand Variations on the Performance of a Production System", International Journal of Systems Science, Vol. 24, No. 7 (1993), 1349-1362.

  200. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Equipment Selection Problems in Just-In-Time Manufacturing Systems", Journal of Operational Research Society, Vol. 44, No. 4 (1993), 345-353.

  201. Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Flexible Manufacturing Systems: An Investigation for Research and Applications", European Journal of Operational Research, Vol. 66 (1993), 1-26.

  202. Gunasekaran, A., Goyal. S. K., Martikainen, T. and Yli-Olli, P., "Multi-Level Lot-Sizing in a Rayon-yarn Company: A Case Study", European Journal of Operational Research, Vol. 65 (1993), 159-174.

  203. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Production Planning and Control in Automated Manufacturing Systems", International Journal of Production Planning and Control, Vol. 4, No. 1 (1993), 2-16.

    BACK TO TOP

    (1992)

  204. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Modelling the Turn-Over Rate of Production System as a Performance Indicator", International Journal of Operations and Production Management, Vol. 12, No. 6 (1992), 44-55.

  205. Goyal, S.K. and Gunasekaran, A., "Determining the Economic Maintenance Frequency of a Transport Fleet", International Journal of Systems Science, Vol. 23, No. 4 (1992), 655-659.

    BACK TO TOP

    (1991)

  206. Martikainen, T., Yli-Olli, P. and Gunasekaran, A., "Incremental Significance of Pre-Specified Macro-economic Factors in Testing the Arbitrage Pricing Theory: Empirical Evidence with Finnish Data", Applied Financial Economics, Vol. 1 (1991), 139-147.

  207. Martikainen, T., Yli-Olli, P. and Gunasekaran, A., "The Finnish Stock Market: An Investigation for Empirical Research and Future Research Directions", Finnish Journal of Business Economics, Vol. 4 (1991), 253-284.

  208. Gunasekaran, A., Goyal, S. K., Subash Babu, A. and Ramaswamy, N., "Effect of Machine Failures in a Multi-stage Multi-facility and Multi-product Production-inventory System", International Journal of Systems Science, Vol. 22, No. 2 (1991), 273-291.

  209. McTavish, R., Goyal, S.K. and Gunasekaran, A., "Implementation of Zero Inventories and Just-In-Time Production Concepts in Chinese Manufacturing Organizations", International Journal of Production Planning and control, Vol. 2, No. 1 (1991), 73-85.

  210. Gunasekaran, A., Goyal, S. K., Subash Babu, A. and Ramaswamy, N., "Optimization of a Multi-stage Production-inventory System with Significant Setup-operations Time", International Journal of Systems Science, Vol. 22, No. 2 (1991), 293-312.

    BACK TO TOP

    (1990)

  211. Goyal, S. K. and Gunasekaran, A., "Effect of Dynamics Process Quality Control on the Economics of Production", International Journal of Operations & Production Management, Vol. 10, No. 7 (1990), 69-77.

  212. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Lot-sizing in a Class of Multi-stage Production-inventory Systems ", International Journal of Systems Science, Vol. 21, No. 11 (1990), 2287-2303.

  213. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Machine Assignment Policies in a Multi-stage Multi-Facility and Multi-Product Production-inventory Systems", International Journal of Systems Science, Vol. 21, No.11 (1990), 2305-2315.

  214. Goyal, S.K. and Gunasekaran, A., "Multi-Stage Production-Inventory Systems", European Journal Operational Research, Vol. 46, No. 6 (1990), 1-20.

    BACK TO TOP

    (1988)

  215. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Analysis of Inventory Policies in an Integrated Production-inventory System with Decaying Materials", International Journal of Systems Science, Vol. 19, No. 2 (1988), 227-239.

  216. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "The Behaviour of a Production-inventory System for Varying Marketing Decisions", International Journal of Systems Science, Vol. 19, No. 2 (1988), 241-250.

    BACK TO TOP

    (1985)

  217. Gunasekaran, A., "A Study of Demand Variations in a Production-inventory System Based on the Cost Aspects Using Statistical Analysis", Modelling, Simulation and Control C. AMSC Press, Vol. 3, No. 1 (1985), 11-29.

  218. Gunasekaran, A., "A Study of Emergency Order Process Starting Time in Single-stage Multi-product Production-inventory System", Modelling, Simulation and Control C. AMSC Press, Vol. 2, No. 2 (1985), 7-23.

    BACK TO TOP

    (1984)

  219. Gunasekaran, A., "A Study of Turn-Over Rate of a Production System Considering the Value of Products", IFIP Global Modelling Conference, Buenos Aires, Argentina, 1984 (in absentia).

  220. Gunasekaran, A., "Application of Aggregate Production Planning Models in Developing Countries: An Analysis", International Seminar on Algorithms for Production Control and Scheduling, Karlovy Vary, Czechoslovakia, 1984 (in absentia).

  221. BACK TO TOP